Sáenz (Buenos Aires Underground)

Sáenz
Platforms Island platforms
Connections Belgrano Sur Line
History
Opening 2018 (expected)
Services
Preceding station   Subte   Following station
Line HTerminus

Sáenz is a future station and the future terminus of Line H of the Buenos Aires Underground.[1] Once complete, the station will connect with the Belgrano Sur commuter rail line and the Metrobus Sur BRT line in a new facility designed for the connection of the three lines.

Construction began in 2012, along with Facultad de Derecho, Las Heras, Santa Fe and Córdoba stations, however it was decided to prioritise the northern extension and Sáenz will open in 2018, instead of with the other stations in 2015.[2]

References

  1. "New Line H". Subterraneos de Buenos Aires. Archived from the original on April 18, 2011.
  2. "Empezarán en enero las obras de las nuevas estaciones de la línea H" [Works start in January of the new stations of line H]. EnElSubte (in Spanish). December 15, 2011.


This article is issued from Wikipedia - version of the 2/6/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.