Taoyuan Metro

Not to be confused with Taiyuan Metro.
Taoyuan Metro
Overview
Locale Taoyuan and New Taipei, Taiwan
Transit type Rapid transit
Number of lines 1 under construction,
5 planned
Website Taoyuan Metro Corp. (Chinese)
Operation
Operation will start 2016
Operator(s)
Technical
System length 186.1 km (115.6 mi) (planned total, except Taolin Line and Taipei Metro Sanying Line)
Track gauge 1,435 mm (4 ft 8 12 in) (all lines except Red Line)
1,067 mm (3 ft 6 in) (Red Line only)
Plan Map

Taoyuan Metro
Traditional Chinese 桃園捷運
Taoyuan Mass Rapid Transit System
Traditional Chinese 桃園都會區大眾捷運系統

Taoyuan Metro (formerly Taoyuan Rail Transit and officially Taoyuan Mass Rapid Transit System) is a proposed rapid transit system for the Taoyuan City area in Taiwan.[1] The proposed network will consist of five lines. A section of Blue Line has merged into the Taiwan Taoyuan International Airport Access MRT System and is under construction, while the surplus is still in the planning phase.

Lines and stations

All lines will use standard gauge track, with the exception of the Red Line which will use 3 ft 6 in (1,067 mm) track as it will use the right-of-way of a part of the TRA Western Line. The Taolin Line segment of the Brown Line from Taoyuan to Shanbi is intended to be built as a bus rapid transit route.

LineTerminiLength (km)Total
Length (km)
Status
Taoyuan Airport MRT TaipeiSanchong4.153.5Under construction
SanchongHuanbei47.4 Under construction
HuanbeiZhongli2.04Under construction
Blue Airport Terminal 2Huanbei17.025.5Under construction
HuanbeiZhongli2.1Under construction
ZhongliBade6.4Planning
Green Main LineDanan/BadeKengkou/Hengshan27.2 Planning
Daxi LineBadeDaxi10Planning
Zhongli LineBadeZhongli Planning
Orange Main LineShanzaidingTongan Planning
Longtan LineShanzaidingLongtan6Planning
Brown Taolin LineTaoyuanShanbi12.524.0Planning
Huilong LineTaoyuanHuilong11.5Planning
Route map

Blue Line

Linghang Station under construction (as of July 2010).
CodeStation Name Connection Location
Taoyuan MRT Blue Line
Stage 1 - Under construction
A14Airport Terminal 3機場第三航廈 DayuanTaoyuan City
A14aAirport Hotel機場旅館
A15Dayuan大園 Green Line
A16Hengshan橫山
A17Linghang領航
A18THSR Taoyuan Station高鐵桃園站 Taiwan High Speed Rail Zhongli
A19Taoyuan Sports Park桃園體育園區
A20Xingnan興南
A21Huanbei環北
Stage 2 - Taoyuan MRT Blue Line (under construction)
A22Yongxing Park永興公園 ZhongliTaoyuan City
A23Zhongli中壢 TRA Western Line

Construction

In March 2011, the Bureau of High Speed Rail, which oversees construction of the project, announced that the 11.4 km (7.1 mi)-long elevated structure from Dayuan Station (A15) to Xingnan Station (A20) had been completed.[2] The rest of the Taoyuan Line passed an environmental impact assessment in July 2014. Construction is expected to last from June 2015 to 2019.[3]

See also

References

  1. 桃園都會區大眾捷運系統 (in Chinese). Department of Rapid Transit Systems. 2008-07-01. Retrieved 2010-06-19.
  2. 《交通》機場捷運大園至中壢路段高架橋全部合龍. 中時電子報 (in Chinese). 2011-03-07. Retrieved 2011-03-07.
  3. Chiu, Chun-chin; Holzer, Wesley; Kao, Evelyn (2014-07-17). "Taoyuan MRT green line passes evaluation, could be finished by 2019". Central News Agency. Retrieved 2014-07-17.

KML is from Wikidata


This article is issued from Wikipedia - version of the 10/14/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.