Bicol International Airport

Bicol International Airport
Paliparang Pandaigdig ng Bicol
Pankinàban na Palayogan kan Bicol
IATA: noneICAO: none
Summary
Airport type Public
Operator Civil Aviation Authority of the Philippines
Serves Legazpi
Location Daraga, Albay
Coordinates 13°06′44″N 123°40′38″E / 13.11222°N 123.67722°E / 13.11222; 123.67722Coordinates: 13°06′44″N 123°40′38″E / 13.11222°N 123.67722°E / 13.11222; 123.67722
Map
Bicol International

Location in the Philippines

Runways
Direction Length Surface
m ft
Asphalt

Bicol International Airport (Filipino: Paliparang Pandaigdig ng Bicol, Bikol: Pankinàban na Palayogan kan Bicol) is an under-construction international airport that will serve Legazpi, the capital city of Albay and the regional center of Bicol Region, in the Philippines.

The airport is in the municipality of Daraga. The P3.5 billion project is on a 200-hectare plateau 15 kilometers from the Mayon Volcano. Some sources name the airport Southern Luzon International Airport (Filipino: Paliparang Pandaigdig ng Katimogang Luzon) . It will replace the old Legazpi Airport, which is only 2 to 3 kilometers from the new one.

Background

Bicol International Airport was in planning since early 2006,[1] when officials discussed the feasibility of an international airport in Legazpi. During March 4 and 5, 2006, officials in Daraga, where the airport would be constructed, discussed with the barangay captains of barangays Alobo, Inarado, Kinawitan, Burgos and Mabini over the conversion of agricultural lands into industrial lands for the airport. It is estimated to occupy at least 2 square kilometres of land, and many families could be displaced from the construction.

It will be the first international airport to be built in Bicolandia and, according to Daraga Mayor Gerry Rodrigueza Jaucian, would be a testament to economic growth in the region and of the dreams of Bicolanos, as shown in the following excerpt from the Manila Times:

"We’re grateful to the President for fulfilling the Bicolanos’ dream to have an international airport. This is the realization of our quest to become one of the booming regions in the country."

Construction

On July 2007, President Gloria Macapagal-Arroyo ordered the DOTC (Department of Transportation and Communications), to fast-track the paperwork on the planned new airport.[2] President Macapagal-Arroyo released 85 million pesos for its advance engineering study.[3] Tourism secretary Ace Durano has assured the allotment of P250 million for the purchase of land. As of November 2007, pre-construction activities such as the feasibility study and site development plan have been completed. The construction contract has been bid for.[4]

The airport was originally scheduled for completion in 2014.[5] However, due to a construction delay, the project was expected to be finished at an unspecified date before 2016.[6] In June 2015, it was reported that the construction is 47% done and would be finished in July 2017,[7] but in July 2016 it was reported that the construction would be delayed further and would be finished in August 2018.[8]

In September 2012, the Budget Department released P4.6 billion to support the public-private partnership (PPP) projects of the Department of Transportation and Communications (DoTC). Of the total, the airport will receive P2 billion to develop and fund the engineering of runways and taxiways.[9]

See also

References

  1. Talks to construct airport under way, Manila Times, March 7, 2006
  2. PGMA orders DOTC to fast-track preparations for Legazpi City's new airport 'on the plateau', Information Agency, July 3, 2007
  3. PGMA's Speech during the Infra Conference for Central Philippines Super Region, Office of the President, July 13, 2007
  4. Daraga international airport’s construction in full steam, Manila Standard Today, November 14, 2007
  5. "Roxas approves P2b for new Bicol airport". Manila Standard. 26 May 2012. Archived from the original on 28 June 2012. Retrieved 16 September 2012.
  6. Adolfo, Jae Denise (19 December 2014). "DOTC allocates P780.9 million for Bicol International Airport". BusinessMirror. Retrieved 29 January 2015.
  7. "Bicol International Airport to Become Operational in 2017". Philippine Flight Network. June 2015. Retrieved October 25, 2016.
  8. "Completion of Bicol International Airport Delayed to August 2018". Philippine Flight Network. July 2016. Retrieved October 25, 2016.
  9. Budget for DoTC’s PPP projects released, BW Online, September 13, 2012. Retrieved September 16, 2012
This article is issued from Wikipedia - version of the 11/14/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.