Interstate 73 in North Carolina

This article is about the section of Interstate 73 in North Carolina. For the entire route, see Interstate 73.

Interstate 73 marker

Interstate 73

Open segments of I-73 as of May 2015 in red
Route information
Maintained by NCDOT
Length: 76.5 mi[1][2][3] (123.1 km)
Existed: 1997 – present
Major junctions
South end: US 220 near Ellerbe
  US 64 / NC 49 in Asheboro
I85 / US 220 / US 421 in Greensboro
I40 / I840 / US 421 in Greensboro
North end: I840 / Bryan Boulevard in Greensboro
Location
Counties: Richmond, Montgomery, Randolph, Guilford
Highway system
NC 72NC 73

Interstate 73 (I-73) is a partially completed Interstate Highway in the U.S. state of North Carolina, traversing the state from south of Ellerbe to Greensboro, through Asheboro. When completed, it will continue south towards Myrtle Beach, South Carolina and north to Martinsville, Virginia.

Route description

As of May 2015, Interstate 73 begins south of Ellerbe, in concurrency with I-74 and US 220, to north of Asheboro. I-73 and I-74 travel north through northern Richmond County and into eastern Montgomery County. In Montgomery County, the Interstates pass between the county's eastern border and the Uwharrie National Forest. The freeway enters Randolph County and passes just west of Asheboro. In Randleman, I-74 splits northwest towards High Point and Winston-Salem. North of the I-74 split, I-73 passes over Randleman Lake, a reservoir formed by the blocking of the Deep River and passes into Guilford County. Entering Greensboro, it ends its concurrency with US 220 as it goes northwest along the Greensboro Urban Loop with US 421 and brief parallel with I-85. At its connection with I-40, US 421 continues north (or geographically west) to Winston-Salem, while I-840 begins. At the Bryan Boulevard exit, both I-73 and I-840 currently end.[4][5][6]

History

Future I-73 and I-74 (US 220) northbound near Asheboro, NC, signs were removed when freeway designated I-73/I-74 in 2012

Authorized by the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA), Interstate 73 was established as a north-south high priority corridor from Charleston, South Carolina to Detroit, Michigan.[7][8]

In North Carolina, because of several U.S. Routes were already planned for improvements in the central piedmont area, Interstate 73 was initially aligned to go through Rockingham, Asheboro, High Point, Winston-Salem, and Mount Airy.[9] The route through High Point was approved in May 1993.[10] However, in November 1993, an organization called Job Link, made up of business leaders from northern North Carolina and southern Virginia, wanted a major highway to connect Roanoke with the Greensboro area. It could be Interstate 73, the group said, but did not have to be.[11] In April 1995, John Warner, who chaired the Senate subcommittee which would select the route of Interstate 73, announced his support for the Job Link proposal. This distressed Winston-Salem officials who were counting on Interstate 73, though Greensboro had never publicly sought the road. But an aide to US Senator Lauch Faircloth said the 1991 law authorizing Interstate 73 required the road to go through Winston-Salem. Faircloth got around this requirement, though, by asking Warner to call the highway to Winston-Salem Interstate 74.[12] In May, Warner announced plans to propose legislation that made the plan for two Interstates official.[13]

When I-73 crossed a border between two states, the federal law authorizing the road required that the two states agree that their sections meet. Originally, both Carolinas selected a route running south from Rockingham. However, North Carolina had more money to spend on roads,[14] and on May 10, 1995, the U.S. Senate Environment and Public Works Committee approved North Carolina's plan for I-73 to run eastward to the coast and enter South Carolina at North Myrtle Beach.[15] Later that year, officials in both states agreed that I-73 would enter South Carolina south of Rockingham and that the other highway would be I-74. This raised the possibility of I-73 bypassing the Myrtle Beach area entirely, since I-74 would run to the Myrtle Beach area.[16]

In May 1997, the first section of Interstate 73 was established, a 12.6 miles (20.3 km) section from south of Candor to Ulah. Signage of "Future Interstate 73" was also placed all along US 220, from Rockingham north to I-40 in Greensboro and south to Candor.[17][18] On January 7, 2008, an 17 miles (27 km) extension south of Candor to Ellerbe was completed; however, because NCDOT had not applied to the FHWA to add the segment to the interstate system, signage along the new stretch of freeway was listed as Future Interstate 73, thus not an "official" addition to the interstate at that time. Federal approval was granted in 2010 to make this part of the interstate system at the conclusion of work to upgrade the highway in Asheboro. The route was given interstate signage in the summer of 2013.[19]

The next section to be completed, and bannered Interstate 73, was the 7.5 miles (12.1 km) southwestern section of the Greensboro Urban Loop, in concurrency with Interstate 40, in February, 2008.[20] The concurrency later changed to US 421 in September of same year (signage corrected by July, 2009).[21][22][23]

The newest sections of Interstate 73 to be completed are the 8 mile stretch of US 220 freeway in Asheboro and the remaining parts of the US 220 freeway designated Future I-73 in 1997. The Asheboro section had several deficiencies that needed to be corrected before it could be designated an Interstate. Work started on this segment from Business 220/NC 134 south of Asheboro to US 220 Business/Vision Drive North of Asheboro in 2010. Work was completed in October 2012. When work was finished Interstate 73 (and 74) shields replaced the Future I-73(and I-74) shields along this portion of US 220.[4] NCDOT had already reached an agreement with the FHWA that they could sign the entire length of the US 220 freeway south of Greensboro to Ellerbe as Interstate 73 once this project was completed.[24] On July 11, 2012, NCDOT gave final approval an extension of Interstate 73 from Interstate 85 to Asheboro to be designated as part of its network.[25] A contract to change the Future I-73 signs to I-73 shields and replace current exit signage with Interstate standard ones was let on December 11, 2012.[26] On February 2013, work crews began converting a 70-mile (110 km) stretch of signage for Interstate 73; work was completed in December 2013.[27] I-73 is thus signed continuously from I-40 in Greensboro to US 220 in Ellerbe, a total of 78 miles. Highways completed, but not signed currently as I-73 include the section of the Greensboro Loop north of I-40, a total of 4 miles, and the US 74 Rockingham Bypass, a total of about 10 miles. Therefore, North Carolina has completed a total of 92 miles of current or future I-73 mileage.[28]

Future

Interstate 73 from the South Carolina state line to US 74/NC 38 interchange is being planned and paid for by SCDOT. Environmental studies were completed in 2011, with a route that includes an interchange at Ghio Road and welcome centers at the state line. Time frame when construction will begin is unknown at this time.[29][30][31][32]

The Western Rockingham Bypass, from the US 74/US 74 Bus interchange to US 220, near Ellerbe. Currently all right-of-way purchases have been completed along the proposed route. Construction on a 3.724-mile (5.993 km) section, along US 220 (south of Ellerbe), began in March 2014; with a contracted amount of $49.8 million, it is expected to be completed by April 2018. The remaining sections of the new bypass were scheduled to start construction by late 2017; however, under reprioritization of construction projects announced in 2014, they were removed from the list of projects to be started through 2024.[33]

A new segment of the I-73 freeway from NC 68, near PTI Airport, to NC 68 at US 220 near the Haw River, is planned in Guilford and Rockingham Counties. All right-of-way purchases have been completed along the proposed route, with construction beginning in April 2014 and scheduled to be completed by April 2017.[34]

Exit list

CountyLocationmi[2]kmOld exitNew exitDestinationsNotes
RichmondState line I-73 south Myrtle BeachFuture continuation into South Carolina
Ghio RoadFuture interchanges (unfunded)[31][32]

Future I74 east / US 74 east Laurinburg
318 NC 38 BennettsvilleExisting interchanges of US 74 (built to interstate standards, signed future due to no connection to interstate)
316 NC 177 Hamlet
Rockingham311 US 1 to US 220 Rockingham, Southern Pines, Cheraw
308Galestown Road Cordova
306
US 74 west / US 74 Bus. east Wadesboro, Rockingham
Future interchange (funded)[33]
20Cartledge Creek RoadFuture interchange to be built as part of Rockingham Bypass project (funded)[33]
22 US 220 south RockinghamFuture interchanges (under construction, to be completed by March 2018)[33]
23Dockery Road / Haywood Cemetery Road
24.940.1825 US 220 north EllerbeCurrent southern terminus of I-73
Ellerbe27.544.31128 To NC 73 west / Millstone Road
29.948.11330Haywood Parker Road
33.153.31633 NC 73 Windblow, Plainview
Norman35.056.31835Moore Street Norman
Montgomery39.062.82239Tabernacle Church Road
Emery40.965.82441
US 220 south / US 220 Alt. north Candor
South end of US 220 overlap
Candor44.070.844 NC 211 Candor, Pinehurst
Biscoe49.078.949 NC 24 / NC 27 Biscoe, Carthage, Troy
Star52.284.052Spies Road Star, Robbins
Ether55.389.03956
US 220 Alt. Ether, Steeds
Randolph58.093.34158Black Ankle Road
Seagrove61.398.74561 NC 705 Seagrove, Robbins
65.4105.34965New Hope Church RoadTo North Carolina Zoo
67.6108.85168
US 220 Bus. north / NC 134 south Ulah, Troy
To US 220 Alt

US 64 Byp.
Future interchange (under construction, to be completed by September 2019)[35]
Asheboro71.3114.771McDowell Road
72.4116.572
A-B
A: US 64 east / NC 49 north Raleigh
B: US 64 west / NC 49 south Lexington, Charlotte
To North Carolina Zoo
74.0119.174 NC 42 AsheboroExit left
74.8120.475Presnell Street
75.7121.876
To US 220 Bus. north / North Fayetteville Street / Vision Drive
77.1124.177Spero Road
78.5126.379Pineview Street
Randleman79.5127.980 I74 west High Point, Winston-SalemWest end of I-74 overlap
80.5129.681 US 311 north Randleman
82.2132.382Academy Street  Randleman
Level Cross86.3138.986
US 220 Bus. south Level Cross
Guilford89.0143.289 NC 62 Climax, High Point
93.6150.67794Old Randleman Road
Greensboro95.0152.978
A-B
95
A-B
A: I85 north / US 421 south Durham, Sanford
B: US 220 north to I85 Bus. to US 29 to US 70 Charlotte, Burlington
North end of US 220 and south end of US 421 overlap
Continuation of I-73 northbound exit 95B and southbound exit 95
96.9155.9122A96To Groometown Road / To Grandover ParkwayNorthbound exit and southbound entrance only
97.0156.1219
218
97
A-B
A: I85 Bus. north / US 29 north / US 70 east Greensboro
B: I85 south / I85 Bus. south / US 29 south / US 70 south High Point, Charlotte
Both southbound exits and northbound entrances
100.2161.3100Gate City BoulevardDDI[36]
102.5165.0213102Wendover Avenue
103.6166.71
A-B
103
A-B
A: I40 east Greensboro
B: I40 west / US 421 north Winston-Salem
West end of I-840 and north end of US 421 overlap; northbound exit left
105.3169.52104West Friendly Avenue
107.3172.73107Bryan Boulevard PTI AirportEast end of I-840 overlap; northbound exit, southbound entrance[37]
Current northern terminus of I-73
109Old Oak Ridge Road  PTI AirportExisting interchange of Bryan Boulevard (pending FHWA approval)[37][38]
110 NC 68 south High PointFuture interchanges (under construction, to be completed by April 2017)[39][40][41]
111 NC 68 Oak Ridge
Summerfield116 NC 150 Summerfield, Oak Ridge
119 US 220 south Summerfield, GreensboroFuture interchanges (under construction, to be completed by December, 2016)[34]
Stokesdale120 US 158 Stokesdale, Reidsville
Rockingham122 NC 65 Stokesdale, Reidsville
123 NC 68 south Stokesdale
Madison
US 311 south / US 220 Bus. north / NC 704 Madison, Wentworth
Existing interchanges of US 220 (upgrade to interstate standards, unfunded)[42]
Mayodan US 311 north / NC 135 Mayodan, Eden

US 220 Bus. south Stoneville
Stoneville NC 770 Stoneville, Eden
State line I73 / US 220 north MartinsvilleFuture continuation into Virginia
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. "Federal Highway Administration (FHWA) Route Log and Finder List: Table 1 - Main Routes". FHWA. Retrieved March 21, 2014.
  2. 1 2 Google (October 26, 2013). "Interstate 73 in North Carolina" (Map). Google Maps. Google. Retrieved October 26, 2013.
  3. Malme, Robert H. (2013). "Why I-73/I-74 in North Carolina?". Self-published. Retrieved December 7, 2013.
  4. 1 2 Malme, Robert H. (2013). "I-73 Segment 8". Self-published. Retrieved December 7, 2013.
  5. Malme, Robert H. (2013). "I-73 Segment 9". Self-published. Retrieved December 7, 2013.
  6. Malme, Robert H. (2013). "I-73 Segment 5". Self-published. Retrieved December 7, 2013.
  7. Scism, Jack (June 9, 1991). "New Interstates Likely Impossible Dream". News & Record. Greensboro, NC. p. E1. ISSN 0747-1858.
  8. Natzke, Stefan; Neathery, Mike; Adderly, Kevin (June 18, 2012). "High Priority Corridors". National Highway System. Federal Highway Administration. Retrieved August 26, 2012.
  9. Scism, Jack (January 3, 1993). "Coming Soon—to a Highway Near You—I-73". News & Record. Greensboro, NC. p. E1. ISSN 0747-1858.
  10. Thompson, Kelly (May 15, 1993). "Interstate to Run Through Triad Detroit to Charleston, SC". News & Record. Greensboro, NC. p. B2. ISSN 0747-1858.
  11. Lounsbury, Helen (November 11, 1993). "Road to Roanoke Vital, Group Says Lobbying for New Interstate". News & Record. Greensboro, NC. p. B3. ISSN 0747-1858.
  12. Catanoso, Justin (April 14, 1995). "New Proposal for I-73 Stirs Triad Rivalry". News & Record. Greensboro, NC. p. B1. ISSN 0747-1858.
  13. Catanoso, Justin (May 2, 1995). "New Interstates May Cross Triad". News & Record. Greensboro, NC. p. A1. ISSN 0747-1858.
  14. Monk, John (April 11, 1995). "Despite S.C. Objections, N.C. Prepares I-73 Link". The State. Columbia, SC. p. B5.
  15. Pope, Charles (May 11, 1995). "I-73 Rolls Through Angry Thurmond's Roadblocks". The State. Columbia, SC. p. B1.
  16. Soraghan, Mike (June 17, 1995). "Carolinas Make a Deal on Routes of New Interstates". The State. Columbia, SC. p. B5.
  17. Steffora, Matt; Mapmikey; Prince, Adam (January 21, 2001). "I-73". NCRoads.com. Self-published. Retrieved August 26, 2012.
  18. Malme, Robert H. (2013). "I-73 Segment 9/I-74 Segment 10". Self-published. Retrieved December 7, 2013.
  19. Malme, Robert H. (2013). "I-73 Segment 10/I-74 Segment 11". Self-published. Retrieved December 7, 2013.
  20. Malme, Robert H. (2012). "I-73 Segment 5". Self-published. Retrieved December 7, 2013.
  21. Siceloff, Bruce (February 21, 2008). "I-40 Bypass Opens in Greensboro". The News & Observer. Raleigh, NC. p. b5. OCLC 11750106.
  22. Wireback, Taft (September 16, 2008). "old I- 40 gets back on track". News & Record. Greensboro, NC. p. A1. ISSN 0747-1858.
  23. Nadolny, Tricia L. (July 31, 2009). "Mapping by car". News & Record. Greensboro, NC. p. A1. ISSN 0747-1858.
  24. Malme, Robert H. (2012). "I-73 Segment 6". Self-published. Retrieved December 7, 2013.
  25. "I-73 Route Change (2012-07-11)" (PDF). North Carolina Department of Transportation. July 11, 2012. Retrieved February 23, 2012.
  26. NCDOT. TIP No. I-5329 (Contract DH00095) Upgrade signs to interstate standards along I-73/74 from I-85 in Guilford County to south of Ellerbe in Richmond County. Project Letting, Division 8, December 11, 2012. Downloaded from: https://connect.ncdot.gov/letting/Pages/Letting-Details.aspx?let_type=8&let_date=2012-12-11%2000:00:00
  27. "Work on the Signing of I-73 between Greensboro and Ellerbe starts Monday". North Carolina Department of Transportation. February 20, 2013. Retrieved February 23, 2012.
  28. Malme, Robert H. (2013). "Why I-73/74 in NC". Self-published. Retrieved December 7, 2013.
  29. Malme, Robert H. (2013). "I-73 Segment 13". Self-published. Retrieved December 7, 2013.
  30. Staff. "Project Status: Northern Project". I-73 Environmental Impact Study. South Carolina Department of Transportation. Retrieved August 26, 2012.
  31. 1 2 I-73 Northern Map (PDF) (Map). South Carolina Department of Transportation. Wallace inset. Retrieved October 24, 2012.
  32. 1 2 Staff. "Project #I-4923". Project Details. North Carolina Department of Transportation. Retrieved August 27, 2012.
  33. 1 2 3 4 Staff. "Project #R-3421". Project Details. North Carolina Department of Transportation. Retrieved August 26, 2012.
  34. 1 2 Staff. "Project #R-2413". Project Details. North Carolina Department of Transportation. Retrieved August 26, 2012.
  35. "US 64 Asheboro Bypass". Retrieved November 1, 2015.
  36. "New I-73 interchange at Gate City Boulevard set to open this weekend". Winston-Salem, NC: WXII-TV. May 12, 2016. Retrieved May 14, 2016.
  37. 1 2 Signing Plan Guildford County - Greensboro Western Loop (PDF) (Map). North Carolina Department of Transportation. July 19, 2013. Retrieved October 26, 2013.
  38. Project #I-5110 / I-73 Connector (PDF) (Map). North Carolina Department of Transportation. Retrieved October 26, 2013.
  39. "NCDOT: Future I-73". North Carolina Department of Transportation. Retrieved August 15, 2015.
  40. Project No. I-5110/R-2413, Guilford County, Future I-73 from SR 2085 (Joseph M. Bryan Blvd.) to Haw River, Map 2 of 5 (PDF) (Map). North Carolina Department of Transportation. Retrieved August 15, 2015.
  41. Project No. I-5110/R-2413, Guilford County, Future I-73 from SR 2085 (Joseph M. Bryan Blvd.) to Haw River, Map 5 of 5 (PDF) (Map). North Carolina Department of Transportation. Retrieved August 15, 2015.
  42. Staff. "Project #W-5324". Project Details. North Carolina Department of Transportation. Retrieved August 27, 2012.

Route map: Bing / Google

KML is from Wikidata
Interstate 73
Previous state:
South Carolina
North Carolina Next state:
Virginia
This article is issued from Wikipedia - version of the 8/4/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.