Downtown Redmond station

Downtown Redmond station is a proposed Link Light Rail station on the north side of Redmond Town Center shopping mall in downtown Redmond, Washington.

The proposed location of the station is at Cleveland Street (SR 202) between 164th Ave NE and 166th Ave NE.[1] However, this station may be moved northeast to a new location more towards central Downtown Redmond because it will not have a stop, as previously considered, at Redmond Transit Center.

The station was originally included in the Sound Transit 2 ballot measure in 2008, but was left out of the East Link Extension after a funding shortfall stemming from the City of Bellevue's desire for a tunneled alignment under Downtown Bellevue.[2] Sound Transit instead completed environmental reviews and selected a preferred alignment to Downtown Redmond, indefinitely deferring the final segment of East Link until a later date.[3] The Sound Transit 3 ballot measure, proposed in 2016, includes $1.1 billion in funding for the two stations in Downtown Redmond, which would open by 2024 if approved by voters.[4] Preliminary engineering on the Redmond extension was approved in February 2016, after being suspended in 2010.[5]

Cost performance

The cost performance of the "Redmond Tech Center" (Microsoft campus) to Downtown Redmond station segment was independently analyzed by The Transport Politic, side by side with other ST3 proposals. It was found to require a subsidy of $15.33 per rider assuming a 30-year project amortization, more than five and a half times more expensive per rider than a proposed intra-Seattle Ballard extension.[6] An expert review panel concluded the Redmond line would cost a comparable $17 per rider but $84 per new transit rider.[7]

References

  1. "Executive Summary". East Link Project Final Environmental Impact Statement (PDF) (Report). Sound Transit. July 2011. p. ES-51. Retrieved May 3, 2016.
  2. Lindblom, Mike (May 4, 2009). "Bellevue eyes Sound Transit train tunnel; Microsoft wants surface route". The Seattle Times. Retrieved May 3, 2016.
  3. "Sound Transit Board identifies preferred East Link light rail route" (Press release). Sound Transit. May 14, 2009. Retrieved May 3, 2016.
  4. Demay, Daniel (June 2, 2016). "Sound Transit approves faster timeline for next phases of light rail". Seattle Post-Intelligencer. Retrieved June 30, 2016.
  5. "Sound Transit advances engineering for Federal Way, Redmond light rail extensions" (Press release). Sound Transit. February 25, 2016. Retrieved August 31, 2016.
  6. Doug Trumm (April 11, 2016), "How To Triage ST3 Package: Build Ballard First", The Urbanist
  7. ST3 Expert Review Panel (PDF), Sound Transit, June 6, 2016, p. 4 via Washington State Department of Transportation
Preceding station  
Link
  Following station
East Link Extension
Redmond
Terminus

Coordinates: 47°40′20″N 122°07′13″W / 47.67224°N 122.120156°W / 47.67224; -122.120156

This article is issued from Wikipedia - version of the 12/3/2016. The text is available under the Creative Commons Attribution/Share Alike but additional terms may apply for the media files.